Warning: Duplicate entry '3036812' for key 'PRIMARY' query: INSERT INTO dp_watchdog (uid, type, message, variables, severity, link, location, referer, hostname, timestamp) VALUES (0, 'php', '%message in %file on line %line.', 'a:4:{s:6:\"%error\";s:12:\"user warning\";s:8:\"%message\";s:227:\"Table './project_hk/dp_cache_filter' is marked as crashed and should be repaired\nquery: SELECT data, created, headers, expire, serialized FROM dp_cache_filter WHERE cid = '2:0022f470d22b17aa7465bc151eab0864'\";s:5:\"%file\";s:45:\"/var/www/html/hutama_karya/includes/cache.inc\";s:5:\"%line\";i:25;}', 3, '', 'http://www.hutama-karya.com/en/project/banyu-urip-project-epc-5', '', '54.211.118.204', 1408680646) in /var/www/html/hutama_karya/includes/database.mysqli.inc on line 134

Warning: Duplicate entry '3036812' for key 'PRIMARY' query: INSERT INTO dp_watchdog (uid, type, message, variables, severity, link, location, referer, hostname, timestamp) VALUES (0, 'php', '%message in %file on line %line.', 'a:4:{s:6:\"%error\";s:12:\"user warning\";s:8:\"%message\";s:1023:\"Table './project_hk/dp_cache_filter' is marked as crashed and should be repaired\nquery: UPDATE dp_cache_filter SET data = '<p>EPC 5 is one of five EPC work packages with the owner Mobil Cepu Limited located in Ngraho Village, Sudu, Mojodelik, Gayam, Bojonegoro City, East Java which is Engineering, Procurement, Construction, and Commissioning jobs. Scope of this 5th package is infrastructure work, including: Basin (capacity of 2,73 million m3), Building (31 buildings), Fly Over (Ramp towards Cepu – Bojonegoro and Fly Over towards Bojonegoro – EPC 5), Pipeline (draining water from Bengawan Solo in /var/www/html/hutama_karya/includes/database.mysqli.inc on line 134
Banyu Urip Project (EPC 5) | PT. Hutama Karya

Banyu Urip Project (EPC 5)

 
 
 
 

Banyu Urip Project (EPC 5)

2011-2014

Data teknis :

EPC 5 is one of five EPC work packages with the owner Mobil Cepu Limited located in Ngraho Village, Sudu, Mojodelik, Gayam, Bojonegoro City, East Java which is Engineering, Procurement, Construction, and Commissioning jobs. Scope of this 5th package is infrastructure work, including: Basin (capacity of 2,73 million m3), Building (31 buildings), Fly Over (Ramp towards Cepu – Bojonegoro and Fly Over towards Bojonegoro – EPC 5), Pipeline (draining water from Bengawan Solo to Basin), River Water Intake (Water intake from Bengawan Solo).

This project was scheduled to be finished in 28 months (6th December 2011 – 5th April 2014) with consortium PT. Hutama Karya and PT. Rekayasa Industri.